• Designing the project plan
  • Calculation of needed materials
  • Estimation of types and volumes of work to be conducted

 

  • Review and analyses of the primary construction plan
  • Estimation of types and volumes of work to be conducted
  • Project planning in accordance with the HSE standards
  • Providing recommendations on required stress resistance, thermal resistance and other similar matters
  • Import and purchase of required materials
  • Preparation of the glazing systems
  • Cutting and assembly of aluminium profiles
  • Installation of aluminium profiles
  • Installation of glazing systems
  • Applying silicone an hermetic materials
  • Closing mid-sections
  • Testing –Structural integrity, impermeability, resistance against water, wind and other natural factors
  • Contacting material manufacturers
  • Assessment of proposed material qualities and prices
  • Negotiating the purchase price for materials
  • Arranging transport and logistics
  • Follow-up of customs procedures
  • Om-site delivery and stocktaking
  • Periodic Visits
  • Repair/maintenance of automatic and electric systems. Electric doors, windows etс.
  • Replacement of damaged or broken glazing, panels, profiles and etc.
  • Replacement of damaged accessories – Handles, openers, connectors, scissors
  • Replacement of the rubber gaskets
  • Restoration of impermeability and structural integrity